Construction of a large multi-level parking lot begins for a new ski resort in the Carpathians
Construction works have started in Volosianka on a multi-level parking facility, which will serve as a key transport infrastructure element for the upcoming all-season resort.
💼EconomyPhoto: Telegram: stryi_info
Key points
- Construction of the first parking phase for 369 cars has begun in Volosianka.
- The project is part of a new all-season mountain resort infrastructure.
- The first phase is scheduled for completion by the end of 2027.
- The final master plan includes over 1,000 parking spaces across three phases.
In the village of Volosianka, located in the mountainous region near the Stryi area, a large-scale construction project has officially commenced. Work has begun on a major multi-level parking facility on the grounds of the future all-season ski resort. This infrastructure project is designed to manage incoming traffic and streamline logistics for the future recreation area.
Project Details and Timeline
According to the developer's plan, the first phase of the parking complex will accommodate 369 vehicles. The completion of this initial construction stage and the commissioning of the facility are scheduled for the end of 2027. The five-level structure will be situated right at the entrance to the resort area.
Overall, the master plan envisions three construction phases that will provide a total capacity of over 1,000 parking spaces. Under the concept, visitors will leave their cars at the perimeter and continue on foot. A dedicated underground pedestrian passage will connect the parking area directly to the Welcome Centre, the lower gondola lift station, and local hotels.
Modern Infrastructure and Safety Standards
The design of the new transport hub incorporates contemporary accessibility and environmental standards. The facility will feature elevators, designated parking spaces for individuals with disabilities, and electric vehicle charging stations. Additionally, a protective shelter will be integrated into the lowest level of the building to ensure safety.
Beyond its primary utility, the architects have included a recreational element in the design. A viewing platform is planned for the roof of the multi-level parking structure. This platform will offer panoramic views of the Slavka river valley and the surrounding Carpathian mountains, turning the parking facility into an additional attraction for visitors.
Source Telegram: stryi_info — t.me/stryi_info/31234 ↗
Read next
🛡️SecurityRussian army losses in 2026 reach record high for the entire war
By late November 2026, the number of Russian military casualties surpassed the total for 2024, setting a new grim record for the invading forces.
Dasha Astafieva searches for her pet — a rescued jackdaw named Patrick
Ukrainian artist Dasha Astafieva has appealed to the public for help in finding her pet jackdaw, which went missing several days ago.
🇺🇦UkraineTragic Road Accident in Poltava Region: Two Killed, Including an Infant
A fatal collision between a passenger car and a truck near the village of Buzova Paskivka has resulted in multiple casualties.
Kim Jong Un appears in public: did new photos dispel rumors about the leader's health?
Following a wave of reports regarding the critical health of the North Korean leader, state media released a series of official images intended to demonstrate his fitness…
Israeli SeniX drone sets new communication range record without external antennas
Israeli company Aero Sentinel has unveiled the SeniX tactical drone, capable of covering 32 kilometers total without the need for bulky ground antennas.
Documentary about Ukrainian National Guardsmen wins Emmy Award
The film '24 Hours in the Kill Zone' has received a prestigious international award in the News category. The documentary highlights the heroism of National Guard soldier…