November 25, 2026 USD 45.35EUR 49.61PLN 11.12
Новини Стрий — коротко й по суті
LIVE
Russian army losses in 2026 reach record high for the entire war Dasha Astafieva searches for her pet — a rescued jackdaw named Patrick Tragic Road Accident in Poltava Region: Two Killed, Including an Infant Kim Jong Un appears in public: did new photos dispel rumors about the leader's health? Israeli SeniX drone sets new communication range record without external antennas Documentary about Ukrainian National Guardsmen wins Emmy Award Russian aircraft approach South Korean ADIZ: details of the incident Ukrainian MFA strongly protests appointment of sanctioned Russian official to IAEA leadership Kremlin Expresses Skepticism Over European Involvement in Peace Talks Tragedy in Kyiv Region: Demydiv Bids Farewell to Mother and Daughter Killed in Drone Strike Russian army losses in 2026 reach record high for the entire war Dasha Astafieva searches for her pet — a rescued jackdaw named Patrick Tragic Road Accident in Poltava Region: Two Killed, Including an Infant Kim Jong Un appears in public: did new photos dispel rumors about the leader's health? Israeli SeniX drone sets new communication range record without external antennas Documentary about Ukrainian National Guardsmen wins Emmy Award Russian aircraft approach South Korean ADIZ: details of the incident Ukrainian MFA strongly protests appointment of sanctioned Russian official to IAEA leadership Kremlin Expresses Skepticism Over European Involvement in Peace Talks Tragedy in Kyiv Region: Demydiv Bids Farewell to Mother and Daughter Killed in Drone Strike

Multi-level parking for 369 cars under construction in Lviv region

🚌 Transport 1 min read 👁 0

The all-season resort GORO has begun construction of a large parking complex, which will become part of the region's new logistics infrastructure.

Multi-level parking for 369 cars under construction in Lviv region🚌Transport

Photo: 4studio.com.ua

Key points

  • Construction of a 369-space parking facility in the first phase
  • Completion of the first stage scheduled for 2027
  • Integration of a shelter and EV charging stations

Construction work has begun on the site of the all-season resort GORO to build a modern multi-level parking facility. The first phase of the project is designed for 369 vehicles and, according to the developer's plans, is scheduled for completion by the end of 2027. The overall concept includes expansion up to three phases, which will eventually provide over 1,000 parking spaces.

Logistics and visitor comfort

The facility is strategically located at the main entrance to the resort area. This location will allow for the redistribution of traffic flows: visitors will leave their private vehicles in the parking lot and continue on foot through an underground passage to the hotels, the lower cable car station, and the Welcome Centre. This solution is aimed at reducing congestion on the resort's internal roads.

The project incorporates modern requirements for inclusivity and sustainability, including the installation of electric vehicle charging stations and dedicated parking spaces for people with disabilities. Additionally, a shelter will be equipped on the lower level of the structure, and the roof of the parking garage will serve as an observation deck with a panoramic view of the mountains and the Slavka River valley.

Source 4studio.com.ua — 4studio.com.ua/news/na-lvivshchyni-pobuduiut-parkinh-na-369-avtomobiliv… ↗

Contact the newsroom

Got a tip, a proposal or a partnership question? Write to us and we will reply shortly.